Testimonial letter from shipyard De Graeve n.v. dated 04/09/89, stating their satisfaction with Zinga and including a brief application description.


The height from the concrete deck to the water level at low tide is approx. 3-4 meter. At high tide, 1.5- 2 meters of each pile is totally submersed in seawater.
The piles were prepared by UHP water-jetting and grit blasting to SA 2.5 with Rz 40 to 60 µm. The application happened under the intense surveillance of SGS AxaMed. It was a very difficult and delicate application as they had to take into account the tidal movement and the constant contact with the sea water. Because the conditions were so extreme, SGS AxaMed demanded a very high dry film thickness of Zinga. The average dry film thickness was 300 µm.
The application of Zinga on the pier legs at Killybegs Harbour was done in the summer of 2000. The customer, the Irish Department of Marine and Natural Resources, and the contractor, SAR Marine & General, wanted to wait until a full year had passed before giving any official comment on the performance of the Zinga coating.
The final inspection report (including pictures) dated 15/06/01, issued by SAR Marine & General for the Department of the Marine and Natural Resources, describes the excellent condition of the piles 12 months after the application.
Pictures of the pier legs taken in August 2001 – one year after the application. Zinga is holding up perfectly with no rust showing. Any marking on the legs is either seaweed or harbour contaminants.
CLICK HERE to download a PDF document of the Final Inspection of Killbegs
In March 2001 she was docked for inspection. No corrosion was found anywhere on her all-steel hull. The rivets were still in excellent condition, and there was no ‘rust sweating’ between any of the plates in the stern area. This was her third inspection during the eleven years. No further Zinga was required and she was refloated shortly after. Needless to say the association that owns the ship is still very satisfied with Zinga.

buoy) whilst the other was galvanised in the traditional hot-dip process (green buoy). Both buoys were top-coated to the same thickness of polyurethane but with a supplementary primer for the hot-dipped buoy. As you can see the green buoy is severely corroded in several places whilst the Zinganised buoy shows no trace of rust.